These drawings mark the notes of the on-site changes that the contractor makes in the As-Built Drawings. A record drawing is the final compiled drawing prepared by the architect himself/herself. Record Drawings: These types of drawings make necessary space for the contractor's changes. Therefore the changes that the contractor makes onto the original design are called As-Built Drawings. On the original construction documents and drawings, the as-built changes are made by the contractor in red ink. They are more like interpolations done for construction purposes. Where necessary, this can be emailed, posted to cloud storage, or copied to a final CD or flash-memory device.Īs-Built Drawings: As-Built Drawings are typically prepared by the contractor.
#As built drawing cost pdf#
Prepare a PDF of the As-Built Drawings.If a sheet has been changed or modifications have been added, label it "Revised As-Built.".If a sheet has not been changed at all or no mark has been added, label the sheet only "As-Built.".When finished, stamp title sheet with "RECORD DRAWING AS-BUILT," including contractor’s name, date, and other relevant information.Be specific when making notes on underground utilities, showing the exact location, depth, and materials used.
#As built drawing cost update#
![as built drawing cost as built drawing cost](https://images.squarespace-cdn.com/content/v1/5818bc96f7e0ab31b4a1c102/1494014338941-CU3O0QB9XE4356X6KPK9/FCS+Social+Media+(3).png)
Include elevations, grade modifications, and related information on piping utilities, earthwork, etc.Provide all necessary information on the contractor's designed systems.Provide the exact details of changes or additional information, including (but not limited to) fabrication, erection, installation, location, sizing, material, dimension, etc.If there is no room for the new value within the drawing, notes can be made in the margin, indicating what values are being replaced. This will make it clear that changes have been made. Never remove old values or details, but rather just draw score lines or "X" through them.
![as built drawing cost as built drawing cost](https://uploads-ssl.webflow.com/58a7c63bb18e6794399bf3e3/5fc577c3bce1ab6a904024cf_3D_Asbuilt_Plan_Set-14.jpg)